Wastewater treatment project

The sewage treatment project in this town is designed to handle 100m3/d of sewage. The project's wastewater discharge is mainly domestic sewage. Each individual building has a septic tank, and the wastewater is collected in a recycled water treatment plant after passing through the septic tank for centralized treatment. To save water resources and maximize the reuse of treated wastewater, all treated wastewater will be used for community greening and toilet flushing.

Keywords:

The image shows a 100m3/d reclaimed water treatment project designed and constructed by our company for a town in Gansu Province.

The town's wastewater treatment project is designed to have a wastewater treatment capacity of 100m3/d. The project's effluent is mainly domestic sewage. Each building has a septic tank, and the wastewater is collected in the reclaimed water treatment plant after passing through the septic tank for centralized treatment. To save water resources and maximize the reuse of treated wastewater, all treated wastewater is used for community greening and toilet flushing.

The reclaimed water treatment system's pipeline is connected to the municipal wastewater network, allowing for short-term discharge of wastewater during the commissioning and maintenance of the reclaimed water treatment plant.

Based on the data provided by the project owner, the town's daily domestic sewage discharge is 100m3, and the designed treatment capacity of the reclaimed water treatment plant is 100m3/d. All treated wastewater is reused for greening and toilet flushing. The reclaimed water treatment system is designed to treat a water volume of: Qd=100m3/d; Qh=4.2m3/h.